SESCO Connection Charges 2003 Booklet
is available now. Click here.

REVENUE & EXPENDITURE

Total Revenue
(mil. RM)
Total Expenses
(mil. RM)
Taxation
(mil. RM)
Extraordinary
Item (mil. RM)
Dividend
(mil. RM)
Net Revenue
(mil. RM)

1995

510.0 (329.1) (22.1) 2.3 (28.0) 133.2

1996

571.2 (386.0) (22.4) - (35.0) 127.8

1997

656.9 (585.1) (20.3) - (18.0) 33.4

1998

707.0 (517.2) (24.5) - (28.8) 136.5

1999

757.8 (575.1) - - (75.0) 107.7

2000

820.8 (690.2) (20.3) - (40.2) 70.1

2001

891.7 (734.3) (23.8) - (40.2) 93.4

2002

941.2 (805.8) (25.7) - (40.2) 69.5

2003

1,016.4 (794.6) (49.9) - (40.2) 131.6

2004

1,075.3 (841.1) (60.1) - (95.9) 78.2
2005 1,193.3 (949.4) (68.0) - (18.0) 157.9

Back To Top

PRICE PER UNIT SOLD
Average Price of Electricity Sold
(sen/kWh)

1995

27.95

1996

27.11
1997 26.43
1998 27.02
1999 26.59
2000 26.39
2001 26.46
2002 26.59
2003 26.70
2004 26.54
2005 26.56

Back To Top

FINANCIAL RATIO
Net Return on Average Net Fixed Assets (%) Operating Ratio (%) Debt-Equity Ratio Debt Service Coverage (Times)
1995 12.2 55.3 30:70 1.82
1996 11.1 60.0 27:73 0.78
1997 5.2 82.5 26:74 3.50
1998 9.4 67.6 23:77 2.66
1999 7.9 73.4 20:80 2.73
2000 6.3 81.2 16:84 2.43
2001 6.7 81.2 20:80 0.66
2002 5.6 85.0 19:81 2.38
2003 8.8 77.5 18:82 3.14
2004 8.7 78.3 16:84 4.05
2005 6.2 82.1 11:89 3.75


Back To Top

• E-Tender Notices
• Application For Electrical Product Approval
• List of Approved Electrical Product (downloadable Adobe Reader .pdf file)
• Application For SESCO Internal Wiring Contract

________________________________________
Application For Electrical Product Approval

1. Introduction

Below are 14 categories of Products that require prior approval before they can be considered for purchase by the Corporation. Once approved, the product will be included in the Approved products List. Turnkey contractors shall use only products in the list for the turnkey projects.

i) Power transformers including OLTC viii) HV & LV Fuses
ii) 11 & 33kV circuit breakers ix) HV insulators
iii) 11 & 33kV Autoreclosers/ sectionalisers x) LV pillars
iv) RMU�s, isolators/ disconnectors xi) Connectors (Ferrules, line taps, cable lugs, parallel groove connectors and etc)
v) HV & LV cables and conductors xii) Lighting and related accessories
vi) Surge Arrestors xiii) Batteries and chargers
vii) Joints & terminations xiv) LV switching devices (cutouts, service intake)
2. Quality and Performance
a. Products offered shall comply with the relevant IEC standards.
b. Products shall also be of high quality and meet the performance stipulated by the Corporation.
3. Application Procedure
The following documents shall be submitted for evaluation of the product approval:
a. Product-technical data/specification:
 Catalogue with introduction of the product completed with full product-technical data and specification shall be submitted.
 Manual on product installation, operation and maintenance instruction shall be submitted, if any.
b. Type test certificates or reports as specified in the relevant standards (IEC/ANSI):
 The type test report for the product shall be in English and test report in foreign language is not acceptable.
 Successfully passed all the type tests as specified in the relevant standards.
 Type test must be conducted by reputable, independent & accredited testing authority. If manufacturer carries out the tests, the tests must be witnessed and certified by third party recognized by the Corporation.
 Type test report on similar items is acceptable if it is a representative of the item seeking approval.
c. Profile of the manufacturer
d. Quality Management System certificate
 Manufacturer�s Quality Management System being certified to ISO9000 by a renowned institution.
e. Sales track record/reference list
 It shall have details of sales history in respect of quantity, user and purchasing country over a significant period.
 If the product has insufficient track record to prove its performance in similar environment, the Corporation may at its discretion reject the application or it may be put on trial user for certain duration before it can be considered to include in the approved product list.


Application for SESCO Internal Wiring Contract
To be an eligible SESCO Internal Wiring Contractor, the following criteria must be met:
• The company must be legally registered.
• The company representative* must be a holder of Certificate of Registration as Electrical Installation Contractor (EIC) (Form O Rule 74) issued by Electrical Inspectorate Unit (EIU).
• The company authorized supervisor must posses competency certificate e.g.. Wireman Grade 1 & 2 issued by EIU.
How to apply to be a SESCO Internal Wiring Contractor:
• Obtain Form CCS/A03.2 from Syarikat SESCO Berhad (Customer Application Services Division).
• Complete the CCS/A03.2 form and submit it along with all the supporting documents to the Electrical Engineer ( Customer Application Service Division) for approval, registration and record keeping.
• The supporting documents (certified true copies) that must be submitted by the applicants are :
i. Photocopies of certificate holder's and the authorized supervisor's identification cards.
ii. Photocopies of certificates : Certificate of Registration as Electrical Installation Contractor, competency certificates, and others such as academic and technical level certificates.
iii. Photocopies of Form 4/49, Trading Licenses, or evidence of ownership, partnership or employee of company.
iv. Passport sized photos of the certificate holder and authorized supervisor.
v. Any other document that may support the application.
Only when the application is approved then the contractor can submit applications of electricity supply (AC/01 form) on consumers' behalf.
* Can be anyone from the company.

SUBSIDIARIES
SESCo-EFACEC Sdn. Bhd. (51%)

  • SESCo-EFACEC Sdn. Bhd. is a joint venture between the Sarawak Electricity Supply Corporation and a foreign partner, Efacec Energia of Portugal. SESCO owns 51% equity of SESCo-Efacec Sdn. Bhd. while the balance is held by the Efacec group and its local partner, Borneo Industry Equipment Sdn. Bhd. The joint venture company was establish in 1999 to venture into the business of manufacturing distribution transformer and medium voltage switchgear for local and export market particularly in the Asean region.



SESCO Engineering Sdn. Bhd.

  • SESCO currently holds 70% equity in SESCO Engineering Sdn. Bhd. and the other 30% is held by CP Power Sdn. Bhd. Going into the second year of operation for SESCO Engineering Sdn Bhd., the year 2003 was a successful year for the Company. Besides reporting growth in turnover and profit, 2003 was also a year of take off for some major projects, like the SIMC, Oya-Bukit Lima Transmission & Kemena EHV Substation Projects.



PPLS Power Generation Sdn. Bhd.

  • PPLS Power Generation Sdn. Bhd. (PPLS PG) is a wholly owned subsidiary company of SESCO. The company was established in 2002 to undertake the implementation of 2 x 55 MW Coal Fired Power Station (Phase II) Extension Project at Sejingkat in Kuching and eventually, own, operate and maintain the power generating facility.


PPLS Management Services Sdn. Bhd.

  • PPLS Management Services Sdn Bhd (PPLS-MS) is a wholly owned subsidiary of SESCO. The company was incorporated in 1996 and has been providing project management and engineering services to SESCO and to clients outside SESCO.

Since March 2003, PPLS-MS has been integrated into SESCO's Strategic Services Department and has been doing SESCO's in-house projects. PPLS-MS is also providing engineering services to Fichtner Engineering, a German Consultant, for the Bakun Hydroelectric Project-EHV Transmission Lines.



  • Corporate Main Business Activities



  • To generate, transmit, transform, distribute and sell energy either in bulk or to individual consumers in any part of Sarawak;
  • To purchase, construct, reconstruct, maintain and operate supply lines, generating stations, transformer stations, and all other appropriate stations, buildings and works, including, subject to compliance with the provisions of any written law relating to the issue of water licenses for the time being in force, the abstraction of water from any lake, river, stream or other natural source, and the doing of all such acts as may be necessary for the purpose of utilizing and returning or otherwise disposing of the water so abstracted;
  • To acquire, in accordance with the provisions of this ordinance, any property, movable or immovable, which the Corporation deems necessary or expedient for the purpose of constructing, extending or maintaining any installation or otherwise carrying out its duties and functions under this Ordinance; and
  • To carry on all such other activities as may appear to the Corporation requisite, advantageous or convenient for it to carry on for or in connection with the performance of its duties under this Ordinance or with a view to making the best use of any of its assets.